The complete handbook

Windows, doors and your LA rebuild.

All seven buying guides in one reading and printing view. Local jurisdiction guides are linked at the end.

Return to the guide library

Chapter 1

Windows and doors for your LA rebuild

A whole-house order starts with a few decisions shared by you, your designer and your builder. Work through them at the stage you are in, then use the other guides when you need more detail.

Start at your project stage

A complete rebuild usually needs a new-construction product and installation discussion. A surviving home with damaged openings may need a repair or replacement approach. Tell the supplier which situation applies.

Early planning: define the package

Start with your plans if you have them, your priorities and a realistic project allowance. A window and door schedule is the list of openings in the drawings. Its IDs, such as W01 and D01, let everyone discuss the same item.

Ask for an initial estimate that identifies its assumptions: quantities, size basis, product type, finish and installation scope. Mark unresolved choices so a preliminary number does not become an accidental specification.

Decide where an upgrade matters most. You may want a particular entry design, quieter bedroom doors or a large living-room opening. Ask for a base package and separately priced alternatives.

Build a complete project budget →

Confirm who reviews your property

A mailing address does not always identify the permitting authority. Altadena is in unincorporated LA County; Pasadena, Malibu and the City of Los Angeles have their own city processes. Malibu specifically asks owners to check city limits even when their address says Malibu.

Choose your local rebuild guide →

Have your design team confirm the applicable code edition, emergency-order provisions and site requirements with the reviewing department. Rebuild exceptions can affect the normal code cycle. A general guide cannot establish a product's acceptance for your permit.

With plans: get a comparable quote

Send the same dated drawing set and schedule to each bidder. Include elevations, relevant wall details, energy documentation and any product requirements identified by your designer. Highlight revisions after the quote was prepared.

Ask bidders to keep your opening IDs and show substitutions explicitly. A different opening style, glass package or frame can change appearance, performance and price. Your designer should review substitutions before the order is released.

Keep energy and wildfire questions separate

NFRC ratings describe energy performance. Wildfire-exposure requirements concern a different set of construction and testing questions. Ask for evidence for the exact assembly, including glass and frame, and give it to the design team. A brand name, a metal frame or an energy label alone does not answer every requirement.

CAL FIRE's home-hardening guidance addresses windows, doors and surrounding conditions together. Use it to discuss resilience with your team; the reviewing authority establishes the requirements for your project.

See U-factor, solar heat and daylight explained →

Before ordering: close the open questions

Budgeting can begin before construction. Production should follow a documented approval of the product configuration and dimensions. Your builder and supplier need to agree whether dimensions come from approved plans, verified site openings or another expressly accepted basis.

Confirm the frame-to-wall details, threshold and finished-floor levels, opening direction and access for large units. Schedule delivery around site readiness and protected storage. Ask which changes become costly once production begins.

Use the order-release checklist →

Understand the contract for the work

California's CSLB treats rebuilding a home after a declared disaster as home-improvement work for contract and payment rules. Its guidance calls for fixed-price contracts and limits contractor down payments to $1,000 or 10% of the contract price, whichever is less. Progress payments must reflect completed work or delivered materials. Have the agreement reviewed for the actual contracting arrangement, especially when supply and installation involve different parties.

Sources and further reading

Reviewed November 6, 2026. Manufacturer resources explain their own products; a link does not imply dealer authorization or availability through Angeles Works.

Chapter 2

Choosing windows: materials, glass and price

Choose the job each window needs to do, then compare complete products. The frame, glass, opening style and installation detail all affect the result.

Choose a material with the tradeoffs in view

Use this as a shortlist, then price the same size, opening style, glass package and finish. The budget descriptions are broad editorial guidance, not measured LA price ranges or a ranking of quality.

MaterialBudget positionWhy consider itWhat to check
Vinyl / uPVCOften an accessible starting point for the budget.Low routine frame maintenance; many common residential configurations.Compare frame width, finish choices, reinforcement and allowed sizes. A premium vinyl system can overlap other materials in price.
FiberglassOften a step up from basic vinyl; compare the actual series.A rigid frame material with painted finishes available in many lines.Color, size and operating-style choices depend on the product family. Check care and finish terms.
AluminumA wide range, especially for large architectural systems.Can support slender sightlines and contemporary designs.Ask about a thermal break and whole-unit ratings. Coastal exposure, finish and hardware terms deserve attention.
WoodVaries widely with species, size and detailing.Natural interior appearance and options for paint or stain.Exposed wood needs an appropriate finish and ongoing care. Ask how water is managed around the assembly.
Aluminum-clad woodOften a higher-budget architectural option.Wood inside, an aluminum exterior covering; less exposed exterior wood to maintain.You still need to maintain the assembly. Confirm cladding construction, interior finish and warranty scope.
Composite / hybridProduct-specific; request a comparable quote.Combines materials to achieve a particular appearance or performance.The name is broad. Get the manufacturer's description of the actual frame and sash.

Wood with an aluminum exterior covering is usually described as aluminum-clad wood. It is different from an aluminum frame. Fiberglass with a wood interior and other mixed constructions also exist.

Three simplified sections: an aluminum frame separated by a thermal break, a wood frame protected by aluminum cladding, and a hollow vinyl profile.
Simplified material concepts, not manufacturing or installation details.

Read the numbers with a picture

U-factor: heat moving through the window

A heated room loses heat through a window toward colder outdoor air. A lower U-factor reduces this heat flow under the same conditions.
Original explanatory diagram. It does not represent a tested product.

Lower means less heat transfer through the assembly under the same conditions. Heat moves toward the cooler side, so the direction can reverse on a hot day. Compare whole-window ratings in the same units.

SHGC: heat from the sun

Sunlight reaches a window. Some solar energy stays outside; some enters the room as heat.
Original explanatory diagram. It does not represent a tested product.

Solar heat gain coefficient describes the fraction of incident solar energy admitted as heat. Lower admits less solar heat. Orientation, shading and the project energy design affect the choice.

VT: the daylight you see

Visible light passes through glass to illuminate a room.
Original explanatory diagram. It does not represent a tested product.

Visible transmittance describes how much visible light passes through. Higher generally means more daylight. It is a different number from SHGC: compare both when choosing glass.

The NFRC label rates the complete product. A center-of-glass value is a different measurement. Match the label or certification to the quoted configuration. Air-leakage and sound ratings address other questions; a low U-factor alone does not establish them.

Read NFRC's illustrated explanation or look up an NFRC label.

Choose how it opens

A fixed picture window provides a view without opening for ventilation. A slider moves sideways. Single- and double-hung windows move vertically. A casement swings from the side; an awning swings from the top. Check screen arrangements, access to handles and space outside the opening.

For a sleeping room, ask your designer to verify the required emergency escape opening using the manufacturer's actual clear-opening data. The overall frame size is not the same as the opening available when the sash is open.

For a rebuild, coordinate the mounting and flashing detail with the wall assembly. For a replacement, establish whether the existing frame stays or the entire unit is removed. The installation scope changes what you are comparing.

What can an upgrade buy?

Upgrade to discussPossible benefitEvidence to request
Different glass packageA different balance of solar heat, daylight, comfort or noise reduction.Whole-unit energy ratings; applicable safety glazing; tested sound rating if noise is the goal.
A different frame or seriesDifferent sightlines, colors, sizes or hardware options.Section drawings, finish samples and the quoted series.
Larger or more complex openingsA particular view or opening arrangement.Structural and installation review, operating weight, access and delivery plan.
A coastal finish or hardware optionSuitability for a more demanding exposure.Manufacturer exposure limits, maintenance instructions and written warranty terms.

Take a shortlist to your designer

Compare your quotes line by line →

Sources and further reading

Reviewed November 6, 2026. Manufacturer resources explain their own products; a link does not imply dealer authorization or availability through Angeles Works.

Chapter 3

Choosing entry and interior doors

Start with where the door goes and how it needs to work. Then choose the appearance and specify the complete assembly.

Entry doors: compare complete systems

A door slab is the moving panel. A prehung unit usually combines the slab with a frame and hinges; the exact package still needs checking. Locks, handles, finishing, surrounding glass and installation may be separate.

OptionWhy consider itTradeoff or question
FiberglassPainted or woodgrain appearances with relatively little exposed wood to maintain.Confirm finish care, panel construction and the complete system performance.
SteelA painted exterior skin in many familiar entry designs.Ask about dent repair, finish protection and exposure limits. Material alone does not establish forced-entry resistance.
WoodNatural grain, species and custom detailing.Confirm weather exposure, required protection and finish maintenance.
Aluminum or other architectural systemsContemporary details, larger configurations or a coordinated glazed entrance.Check exact assembly ratings, frame construction, hardware, threshold and installation requirements.

A pivot describes the way a door turns. It is not a material or a performance rating. Ask about clear passage width, sweep, pivot position and the floor/threshold detail before choosing it.

Explore entry-door designs →

Interior doors: choose by room

A bedroom or home office may justify a heavier, sound-reducing assembly. A closet may have different priorities. Solid-core and hollow-core describe construction; a wood-look finish does not establish which core is inside. Ask for the manufacturer's description.

Solid-core doors can reduce sound transmission compared with hollow-core versions, but gaps, seals, walls and installation also matter. Avoid treating an ordinary door as soundproof.

ChoiceWhat to settle before ordering
Single swing or double doorsNumber of leaves, active leaf, swing direction and a drawing of the opening. “Double acting” means a door can swing both ways; it is a different detail.
Concealed hingesHinges hidden when the door is closed. Confirm the selected hinge, load capacity, adjustment and compatibility.
Concealed frame / flush with the wallCoordinate the jamb system with wall thickness, finished surfaces and installation sequence. Concealed hinges alone do not create this appearance.
Pocket or surface slidingCheck the complete track/frame kit, wall space, hardware, privacy latch and service access.
Material and finishSpecify face material, core, finish sample and edge treatment separately. Marketing names do not replace a construction description.

Explore interior-door designs →

Three different widths

Nested widths show the moving door leaf, the outer frame and the larger rough opening in the wall.
The drawing is conceptual. Installation clearances come from the selected system and approved detail.

Leaf size measures the moving panel. Frame outside size measures the assembly. Rough opening is the opening prepared in the wall. Write down which measurement you mean. Also confirm jamb depth against the wall with all finishes, and coordinate height with the finished floor.

For sidelights, record each sidelight width, the door width and the total assembly width. For handing, a marked plan or drawing is safer than an unqualified “left” or “right,” because viewing conventions differ.

Price the details together

For a garage-to-house door or another location with special requirements, have your designer specify the assembly and hardware. An ordinary interior door should not be substituted based on appearance.

Sources and further reading

Reviewed November 6, 2026. Manufacturer resources explain their own products; a link does not imply dealer authorization or availability through Angeles Works.

Chapter 4

What will the complete job cost?

A useful budget names what is included and what is still unknown. Separate the product package from the work needed to get it installed and finished.

Write down the complete scope

Cost itemAsk the bidder
Products, glass and hardwareWhich opening IDs and quantities are covered? Are screens, locks, handles, finishes and glass upgrades included?
Delivery and unloadingWhere is delivery made? Who unloads, provides lifting equipment, checks access and stores the units?
InstallationWho installs and coordinates flashing, sealants, anchorage and thresholds? Is installation actually in this contract?
FinishingWho paints or stains, installs trim and repairs adjacent stucco, drywall or flooring?
Removal and additional workDoes this project need old-unit removal, disposal, opening changes or concealed-damage repairs? How are changes approved?
Tax, fees and allowancesAre taxes included? Which fees belong to this scope? Which amounts are estimates or exclusions?

Add up your project

Enter amounts from your quotes in US dollars. Count an item once. These entries stay in this page and are not sent with a quote request.

Your planning total $0.00

Blank items count as zero. This is a sum of your entries, not a market-price estimate. Confirm any unresolved costs before committing.

Ask what a lower-cost option changes

Start with the same schedule and ask the supplier to price alternatives. A different finish, series or configuration may lower the package price. Keep any required performance and approved design conditions in the comparison.

Ask for the actual difference in dollars and the consequence: a wider visible frame, fewer color choices, different hardware or a different delivery commitment. Compare a complete base package with named upgrades.

Changing an opening may also affect drawings, structure and finishes. Have your designer and builder review those consequences before counting a product saving.

Distinguish an estimate from an order

An initial estimate helps you plan. A detailed quote should list the chosen specifications, price, exclusions and delivery terms. Ask how long the offer is valid, when pricing becomes committed and what happens if plans change.

Angeles Works normally provides an initial estimate within a day and a detailed quote in two to three days while specifications and factory pricing are confirmed. The delivery date belongs in the quote. Ask us to identify any unresolved selections.

For contracted installation or disaster-rebuild work, check the applicable contract and payment rules with your contractor. A product-payment request should not be assumed to settle the rules for a combined installation agreement.

Check whether two quotes cover the same job →

Sources and further reading

Reviewed November 6, 2026. Manufacturer resources explain their own products; a link does not imply dealer authorization or availability through Angeles Works.

Chapter 5

How to compare window and door quotes

Put the quotes beside the same drawing set. Resolve differences before deciding which total is better for your project.

Compare the same package

Use “included,” “excluded” or “needs confirmation.” An empty space in a quote is a question to resolve. You can type notes below and print them; entries are not uploaded or saved after reloading.

CheckQuote AQuote B
Plans
Drawing revision, opening IDs, quantities and measurement basis
Product
Manufacturer, exact series/model, frame construction and operating style
Glass and performance
Glass configuration, energy ratings and required project documentation
Appearance
Interior/exterior colors, finish, grids, sightlines and approved samples
Hardware
Locks, handles, hinges/pivots, screens and any motorized components
Installed scope
Installation, flashing, anchorage, threshold, trim and finish repairs
Logistics
Delivery, unloading, lifting equipment, storage and damage inspection
Exclusions
Removal, opening changes, concealed damage, taxes and fees
Commercial terms
Quote validity, delivery commitment, approved changes and cancellation terms
Service
Product warranty, installation warranty, labor coverage and named contacts
Compare complete totals

Resolve the differences in writing

A supply-only price and an installed price cover different work. A quote with an allowance for hardware is different from one with the exact lock selected. A material name without a series or construction description leaves room for an unintended substitution.

Ask both suppliers to identify the same inclusions and separately price the remaining differences. Keep the original quote and the written clarification together. Have the design team accept any proposed change to the approved specification.

A message you can send

Please confirm that your quote uses the attached drawing revision and opening schedule. For each opening, identify the exact product, dimensions, glass, finish, hardware and required documentation. Please list delivery, unloading, installation, finishing, taxes and exclusions separately, and identify the delivery commitment and service contact. Show any proposed substitutions before we approve the order.

Change the request to fit your project. If you have no final plans yet, ask the supplier to identify assumptions and label the price as preliminary.

Sources and further reading

Reviewed November 6, 2026. Manufacturer resources explain their own products; a link does not imply dealer authorization or availability through Angeles Works.

Chapter 6

From order approval to installation

An approved drawing and a named owner for each handoff make an order easier to manage. Agree on the sequence with your supplier and contractor.

Five handoffs to agree on

  1. Define the order

    Supplier and homeowner settle the product list, selections, inclusions and price. The design team reviews proposed substitutions and required documentation.

  2. Verify dimensions and details

    The party assigned to measurement checks the agreed basis. Builder and supplier coordinate rough openings, frame depths, finished floors, handing, thresholds and any surrounding glass.

  3. Approve for production

    Record the drawing revision and written approval. Confirm who may authorize changes, what can still change and what a change will cost.

  4. Receive and protect

    Confirm access, unloading, lifting needs and storage. Check quantities, opening labels and visible condition. Follow the written reporting procedure for discrepancies or damage.

  5. Install and close out

    The installer follows the selected system's instructions and approved details. Check operation, locks, seals and finishes together, then keep product labels, instructions and service contacts.

Order-release checklist

Coordinate delivery with the site

A manufacturing estimate, a shipping estimate and a confirmed site delivery date describe different milestones. Ask which one you have and what remains unresolved. Arrange a delivery window with the builder before dispatch.

Oversized glazed units and heavy doors can need special handling. Confirm weight, access route, equipment and responsibility before the truck arrives. Keep products protected and stored as their manufacturer directs.

For Pacific Palisades work, check the City's current truck-delivery guidance as part of scheduling. Street access and jobsite conditions still need confirmation.

Check the completed work

Walk the openings with the installer. Check that each unit matches the order, opens and locks as intended, and has the agreed finish and hardware. Record remaining items with photos and a named contact. Keep required labels available for inspection and retain copies for your records.

Installation and product warranties may be handled by different parties. Get both responsibilities in writing before the order, then use the same contacts for closeout.

Keep a service record →

Sources and further reading

Reviewed November 6, 2026. Manufacturer resources explain their own products; a link does not imply dealer authorization or availability through Angeles Works.

Chapter 7

Who helps if something goes wrong?

The useful question is who will respond, what they will cover and how to reach them. Keep those answers with the order.

Agree on responsibility before purchase

SituationWhat to establish
Shipping or handling damageWho receives the delivery, documents condition, reports damage and arranges the remedy? Confirm the reporting deadline and procedure.
Wrong or missing itemWho checks opening labels and packing lists against the order? Who coordinates replacements?
Product defectWhich manufacturer or supplier receives the claim? What proof and inspection are required?
Installation or water-management issueWho evaluates the installation and interfaces with the wall, sill or threshold? Obtain the installer’s separate written coverage.
Glass, finish or hardware problemDoes each component have its own coverage, exclusions and service route?
Removal, shipping and reinstallationDoes coverage pay only for a part, or also for labor and related work?

Read the scope behind the warranty length

Check who is covered, when coverage begins, whether it transfers, what maintenance is required and which remedy is offered. Exposure, finishing and installation conditions may affect coverage. “Limited lifetime” does not by itself describe labor, freight or every component.

For a coastal property, ask about distance-to-saltwater exclusions, finish care and hardware coverage. Get the warranty for the exact product and options you are ordering.

Manufacturer terms describe that manufacturer's products. They do not establish coverage for another supplier. For an Angeles Works order, request the written coverage for the selected model and components with your quote.

Keep a small service file

When requesting help, identify the opening, describe when the issue occurs and attach clear photos. Ask for the next step and an expected response date. If more than one party is involved, request a joint assessment instead of authorizing changes that could erase evidence of the cause.

Sources and further reading

Reviewed November 6, 2026. Manufacturer resources explain their own products; a link does not imply dealer authorization or availability through Angeles Works.